Introduction
When Melitta UK Ltd / Cofresco Foodservice identified the need to replace ageing domestic hot water plant at its manufacturing facility, the opportunity arose to review both the condition and sizing of the existing system. The site’s original installation consisted of two gas-fired water heaters, one of which had already been taken out of service following changes to the building’s hot water demand.
With shower facilities no longer in operation, the remaining domestic hot water requirements were significantly lower than when the original equipment was installed. Working with Acaps Limited, the site selected a Lochinvar AquaStore heat pump water heater solution that could meet current demand more efficiently while making use of available recovered heat from the manufacturing process.
Project Objectives
- Replace ageing gas-fired water heaters nearing the end of their operational life.
- Right-size the domestic hot water system to reflect the site’s current usage requirements.
- Improve overall system efficiency through the use of heat pump technology.
- Utilise rejected heat from the manufacturing process to support hot water generation.
- Deliver a reliable, future-ready hot water solution with reduced maintenance concerns.
Solution
Following a review of the site’s domestic hot water requirements, it was determined that the existing gas-fired plant was substantially oversized for current demand. Changes to the building’s operation had resulted in the associated shower facilities being taken offline several years earlier, significantly reducing hot water consumption across the site.
To provide a more appropriate and energy-efficient solution, a Lochinvar AquaStore heat pump water heater was installed on the factory plant deck, replacing the ageing gas-fired equipment. Rather than relying on direct fossil fuel combustion to generate hot water, AquaStore captures and upgrades available low-grade heat to efficiently produce domestic hot water.